By Polo International, Fort Lauderdale · License CCC1329676 · Updated November 2026
The short answer
Budget from the roof’s condition and Florida’s rules, not a price list: inspect the roof, learn which rules can force spending, price the paths that fit, and compare written quotes line by line.
Property managers and condo treasurers have to put the roof in next year’s budget without knowing exactly what it will need. These five steps turn that guess into a plan you can defend to an owner or a board, and time the work so it isn’t an emergency.

Step 1: Know what you have
Start with a written inspection. The National Roofing Contractors Association recommends inspecting roofs and making needed repairs twice a year, with extra checks after severe weather. Each inspection should note wet areas, drains, seams, flashing, pipes and rooftop equipment, so you can see what’s changing from one visit to the next.
A maintenance agreement turns that into a known cost. Ours puts the visits on a schedule: the crew pressure-washes the roof, checks and seals the penetrations, seams, edge metal, gutters and downspouts, and coats any area that no longer seals. Covered leaks are checked within three business days, weather permitting, and covered repairs cost nothing extra. It’s a service agreement, not a warranty.
Step 2: Know the rules that can force spending
| Rule | Who it applies to | What it means for the budget |
|---|---|---|
| The 25% rule (Florida Building Code 1511.1.1) | Any building | Repairing, replacing or recovering more than 25% of a roof or roof section within 12 months can require the whole roof or section to meet current code, unless it was built to the 2007 code or later. |
| Condo reserves (Florida Statutes 718.112(2)(f)) | Condo associations | The budget must include reserve accounts for capital expenditures and deferred maintenance, and these must include roof replacement. |
| Structural integrity reserve study (718.112(2)(g)) | Condo buildings three habitable stories or higher | A study at least every 10 years, and the roof is the first item it covers. For budgets adopted on or after December 31, 2024, owners can’t vote to fund less than the study requires for the roof and the other study items. |
| Milestone inspections (Florida Statutes 553.899) | Condo and co-op buildings three habitable stories or higher | Due by December 31 of the year the building turns 30 (25 where the local agency sets it), then every 10 years. If the inspection finds serious damage, an engineer’s detailed phase two report follows, and repairs must start within 365 days of it. |
Our guide to Florida roof rules for commercial buildings walks through each one, and spray foam roofs and insurance covers the paperwork insurers ask about.
Step 3: Price the paths that fit your roof
Maintain
Scheduled inspections and small repairs. It’s how a dry roof stays a candidate for a coating instead of a replacement.
Coat or restore
For a roof that’s still dry and solid: wet spots out, then a silicone coat over the roof you have. Our coatings come with a warranty of up to 20 years.
Replace
When the roof is soaked, already has two coverings, or the building needs insulation and slope: a spray foam re-roof with two 20-year warranties.
Ask for each path that fits your roof to be priced in writing, so the board compares real numbers. See what a commercial roof coating costs and our commercial roof replacement page.
Step 4: Compare quotes so the price holds
So the price you sign is the price you pay, get these in writing from every bidder:
- The system and the products by name, with the product approval number in Broward and Miami-Dade.
- How wet areas will be found, and how extra repairs are priced if more turns up.
- The permit and inspections, and who pulls them.
- How the site and the people in the building are protected.
- The schedule, and what happens if weather stops work.
- The warranties, who gives them, and the contractor’s license and proof of insurance.
“We had bids from 4 different companies, and each one was much higher than Polo. … It did not cost a single penny additional then the contract.”
Putting the roof in next year’s budget? Get a written quote to plan from.
Step 5: Time it before it’s an emergency
Planned work gives the board time to fund the reserve, get the permit and book the crew in good weather. On one condo association’s re-roof, the owner wrote that the permits were received 13 days after the contract was signed, and the cleanup was done 4 weeks after the crew arrived.
Emergencies still happen. Florida’s code lets emergency repairs go ahead first, with the permit application submitted within the next working business day (section 105.2.1). After a storm, our guide to spray foam roofs and hurricane season covers what to check.
Roof budgets for Fort Lauderdale buildings
Polo International inspects, maintains, coats and replaces commercial and condo roofs from our office at 1001 NW 62nd Street in Fort Lauderdale. Start with roof inspections and maintenance, or see how we work with condo and HOA boards and on spray foam roofing. Every quote lists the system, the price and the warranties in writing. See where we work.
Questions owners ask
What is the 25% rule for roofing?
Under Florida’s building code, repairing, replacing or recovering more than 25% of a roof or roof section within 12 months can require the whole roof or section to meet current code, unless it was built to the 2007 code or later.
How much should we set aside for a commercial roof?
There’s no honest rule-of-thumb number; it depends on the roof’s condition and the path it points to. For condo buildings that need one, the structural integrity reserve study sets the roof reserve. For other buildings, start from an inspection and written quotes for the paths that fit.
Should we maintain, coat or replace?
The roof decides. If it’s dry and solid, maintenance or a coating keeps it going. If it’s soaked, already has two coverings or has blisters, Florida’s code requires a tear-off first. An inspection tells you which.
Do condo associations have to reserve for the roof?
Yes. Florida law requires a condo budget’s reserve accounts to include roof replacement. For buildings that need a structural integrity reserve study, budgets adopted on or after December 31, 2024 can’t fund less than required for the roof and the other study items.
How do we keep a roof job from going over budget?
Compare quotes for the same system and products, get the repair allowance and extra-repair pricing in writing, make sure permits and inspections are included, and sign a contract price.
When should we start planning?
As soon as an inspection shows wear, so the work can be funded, permitted and scheduled for good weather rather than done in a hurry after a leak.
Sources
- Florida Statutes (2025), section 718.112(2)(f) and (g): condo reserves and the structural integrity reserve study. flsenate.gov
- Florida Statutes (2025), section 553.899: milestone inspections. flsenate.gov
- Florida Building Code, Building, 8th edition (2023): section 1511.1.1 (25% rule) and Chapter 15. codes.iccsafe.org
- Florida Building Code, Building, 8th edition (2023): section 105.2.1 (emergency repairs). codes.iccsafe.org
- National Roofing Contractors Association, Professional Roofing, “Maintaining compliance,” Mark S. Graham, February 2024. professionalroofing.net
Get a quote for your roof
Polo International has sealed more than 50 million square feet of roofs since 2008. We’ll put the system, the price and the warranty in writing.




