The short answer
An SPF (spray polyurethane foam) roof is liquid foam sprayed onto a flat roof, where it expands into one seamless, insulating layer under a protective coat. Florida’s code sets the rules for its slope, its coating and its approval.
If you’re talking to flat roofing contractors in Fort Lauderdale, spray foam will come up. Florida’s code sets three key rules for it: at least a 2% slope so water drains, a coating within 72 hours of the foam, and in Broward and Miami-Dade an approved system the coating maker inspects. Here’s how SPF roofing systems actually go on, what the code asks for at each step, and the questions that tell you whether the contractor does it right.
What an SPF roof is
Liquid foam is sprayed onto the roof and expands into a rigid layer that bonds to what’s below, filling cracks and joints. It’s the roof and the insulation in one: Polo’s product sheets put it at about R-6.5 per inch (R-value measures how well insulation slows heat; higher is better), one of the highest R-values per inch in roofing. Because it’s sprayed, it has no seams, and it seals itself around drains, pipes and rooftop equipment.
Florida’s code names the lab tests the foam and its coating have to pass (ASTM C1029 for the foam, ASTM D6694 for a silicone coating). Ask your contractor for the data sheets that show it.
How it’s built, step by step
-
Inspect the roof, then quote it
We walk the roof, find what needs fixing and send a written quote with the system and the price.
-
Permit, then protect the site
In Broward and Miami-Dade, a permit comes first, even for repairs. Then the crew covers the walkways and railings between the entrance and the roof access.
Florida Building Code 1512.3
-
Cut out what’s wet
A sound roof stays where it is. Wet insulation or a damaged deck is cut out first, so the foam bonds to something solid. In Broward and Miami-Dade, the deck is prepared the way the system’s product approval says, and foam can’t go over shingles.
Florida Building Code 1511.3, 1521.18, 1521.18.1
-
Spray the foam and build in slope
The foam goes on thicker in low spots so water runs off. The finished roof needs a design slope of at least a quarter inch per foot (2%).
Florida Building Code 1507.14.1
-
Coat it within 72 hours
A reflective silicone topcoat goes over the foam to shield it from the sun. The code requires the coating no sooner than 2 hours and no later than 72 hours after the foam.
Florida Building Code 1507.14.3
-
Inspection and the coating maker’s sign-off
The building official inspects permitted roofing work. In Broward and Miami-Dade, the coating manufacturer’s representative also inspects the finished foam system, and a certificate goes to the building official within 30 days.
Florida Building Code 1512.4.1, 1521.18.2

Condo roof after condo roof at Century Village
Between May 2024 and February 2026 we put new spray foam roofs on building after building at Century Village in Deerfield Beach. Cambridge B, below, is one of them: 24,927 sq ft, finished in March 2025.

“This is a VERY Experienced company and crew of men that turn your old, worn out roof into this Amazing new roof.”
Spray foam goes over metal too. At Solomons Warehouse we sprayed foam over a ribbed metal roof of about 100,000 sq ft in June 2024, so the panel seams and fasteners ended up under one layer.
Where spray foam isn’t the answer
- A roof that’s soaked through, or already has two roof coverings, has to come off first.
- In Broward and Miami-Dade, foam can’t go over composition shingles.
- The foam needs its coating. The code requires it within 72 hours, and the coat is the part you keep up over the years.
- It depends on the weather: the code ties the application to the maker’s instructions for the conditions at the time.
- It needs a crew trained on that system. Ask who certified them.
Questions to ask any SPF roofing contractor
- Your Florida license number? Look it up with the state’s DBPR. Ours is CCC1329676.
- Which foam and which coating, and what is the product approval number?
- Are you certified by that system’s manufacturer? We’re a certified installer for Manta, NCFI, Everest Systems, Henry, GE Silicones, Carlisle, Polyglass and Gaco Western.
- Who pulls the permit and books the inspections?
- Who inspects for the coating maker, and when?
- What warranties come with it, and from whom?
- How will you protect the building, and the people in it, while you work?
Want these answers for your roof, in writing? Start with a roof visit.
SPF roofing from Polo International in Fort Lauderdale
We’re a flat roofing contractor based at 1001 NW 62nd Street in Fort Lauderdale, licensed in Florida since 2011 and in business since 2008. Our project list has 27 spray foam roofs, up to 180,000 sq ft, and our spray foam roofing comes with two 20-year warranties: the manufacturer’s labor and material warranty and our own. Condo boards can start with condo and HOA roofs or our Deerfield Beach work; how foam roofs handle wind is in spray foam roofs and hurricane season. Before you sign, read spray foam roofs and insurance and how to budget for a commercial roof. See where we work.
Questions owners ask
What is an SPF roofing system?
Spray polyurethane foam sprayed onto the roof, where it expands into one seamless, insulating layer that bonds to the roof below, finished with a protective coating. Florida’s code requires that coating within 2 to 72 hours of the foam.
What are the disadvantages of a foam roof?
It can’t go over a soaked roof or one that already has two coverings. It depends on dry, suitable weather during the install. And the coating has to be kept up, because it’s what protects the foam.
Can spray foam go over my existing roof?
Often, yes. A dry, sound roof can stay, with wet areas cut out first. In Broward and Miami-Dade, the foam system needs a product approval and the deck has to be prepared to it, and foam can’t go over shingles there.
What is the 25% rule for roofing?
Under Florida’s building code, repairing, replacing or recovering more than 25% of a roof or roof section within 12 months can require the whole roof or section to meet current code, unless it was built to the 2007 code or later. Our Florida roof rules guide has the details.
How long does a spray foam re-roof take?
It depends on the size of the roof and the weather. On one condo association’s re-roof, the owner wrote that we were on site March 24 and had the dumpsters gone and the cleanup done 4 weeks later.
What warranty comes with a spray foam roof?
Ours come with two 20-year warranties: the manufacturer’s labor and material warranty and our own Polo International warranty. Your written proposal spells out both before any work starts.
Sources
- Florida Building Code, Building, 8th edition (2023), Chapter 15: sections 1507.14.1–1507.14.3 and Table 1507.14.3 (sprayed polyurethane foam roofing), 1511.1.1, 1511.3, 1512.3, 1512.4.1, 1521.18, 1521.18.1, 1521.18.2. codes.iccsafe.org
- Florida Department of Business and Professional Regulation, license search. myfloridalicense.com